*00116612
*00520250613113814.0
*007cr
*007ta
*008120625s2000 no 000 u eng
*00901477cam a2200289 c 4500
*019 $bl
*020 $a8277061420$qh.
*035 $a(EXLNZ-47BIBSYS_NETWORK)990008196704702201
*035 $a(NO-LaBS)14227427(bibid)
*035 $a(NO-TrBIB)000819670
*035 $a(NO-TrBIB)092989314
*035 $a000819670-47bibsys_network
*040 $aNO-OsNB$bnob$ekatreg
*1001 $aWang, Kesheng$d1945-$0(NO-TrBIB)90283384$_14930000
*24510$aProcess planning and its integration with design and machining process$cKesheng Wang, Tang Meng, and Hirpa Gelgele
*260 $aTrondheim$bDepartment of Production and Quality Engineering, Norwegian Institute [sic] of Science and Technology$c2000
*300 $a6 bl.$bfig.
*4901 $aReport / Department of Production and Quality Engineering, Norwegian Institute [sic] of Science and Technology$v200007
*500 $a"ICME 2000. The 8th International Conference on Manufacturing Engineering, Sydney, August 27th-30th, 2000."
*533 $aElektronisk reproduksjon$b[Norge]$cNasjonalbiblioteket Digital$d2009-08-25
*7001 $aGelgele, Hirpa L.$0(NO-TrBIB)98071307$_14930100
*7001 $aMeng, Tang$0(NO-TrBIB)32952$_14930200
*830 0$aRapport (Norges teknisk-naturvitenskapelige universitet. Institutt for produksjons- og kvalitetsteknikk : trykt utg.)$x1500-1288$v200007$w999614818544702201$_204440800
*85641$3Fulltekst$uhttps://urn.nb.no/URN:NBN:no-nb_digibok_2009073101046$yNettbiblioteket$zDigital representasjon
*901 $a80
*999 $aoai:nb.bibsys.no:990008196704702202$b2021-11-14T19:40:41Z$z990008196704702202
^