*001379640
*00520160622162147.0
*007ta
*008090624s1983 no# 000 0 eng d
*00900978cam a2200253 c 4500
*015 $a8306252$2nbf
*019 $bl
*020 $a8257082449$qh.
*035 $a(EXLNZ-47BIBSYS_NETWORK)998441324974702201
*035 $a(NO-LaBS)14007029(bibid)
*035 $a(NO-TrBIB)844132497
*035 $a844132497-47bibsys_network
*040 $aNO-TrBIB$bnob$ekatreg
*044 $cno
*08274$a338.476669$qNO-OsNB$23/nor
*1001 $aBerg, Sigbjørn Atle$d1947-$0(NO-TrBIB)90159878$_11576000
*24510$aEstimation of production capacities in a putty-clay production model :$bNorwegian manufacturing industries 1962-81$cby Sigbjørn Atle Berg
*260 $a[Oslo]$bUniversitetet i Oslo, Sosialøkonomisk institutt$c1983
*300 $a36 s.$c30 cm
*4901 $aMemorandum / Institute of Economics. University of Oslo$v1983:17
*830 0$aMemorandum (Universitetet i Oslo. Sosialøkonomisk institutt : trykt utg.)$x0801-1117$v1983:17$w998120437074702201$_11432400
*901 $a80
*913 $aNorbok$bNB
*999 $aoai:nb.bibsys.no:998441324974702202$b2021-11-14T20:15:41Z$z998441324974702202
^